• Dry screed flooring
• Joisted timber floors for residential buildings (loadbearing floors)
• Battened floors for residential and commercial buildings (battens should be 600 mm apart)
• Dry screed flooring
• Joisted timber floors for residential buildings (loadbearing floors)
• Battened floors for residential and commercial buildings (battens should be 305-610 mm apart)
• Continuously supported floating floors
• Sports subfloor construction (loadbearing floors)
• Dry screed flooring
• Subfloor levelling underlayment for soft and resilient floor coverings
• Battened floors for residential buildings (battens should be 405 mm apart)
• Continuously supported floating floors
• Wall sheathing and levelling
• Dry screed flooring
• Subfloor levelling underlayment for soft and resilient floor coverings
• Battened floors for residential buildings (battens should be 305 mm apart)
• Continuously supported floating floors
• Wall sheathing and levelling
• Subfloor levelling underlayment for soft and resilient floor coverings
• Wall and ceiling sheathing
• Sarking boards for soft bituminous roof tiling